PRE-OPERATIVE LEGAL COMPLIANCE

Procedures, Permits and Construction Licenses

Environmental Site Assessment

  • Due Dilligence

  • Phase I​ ESA
  • Phase II ESA

Image by Joey Kyber

Land Use, Construction and Building Licenses

  • Water and Drainage Connection Procedurese

    • Water and Drainage Feasibility

    • Pluvial Project Approval 

    • Secondary Networks Approval

    • Feasibility of Electrical Energy

  • CFE Contract

    • Installation Verification and Approval Report

    • Electricity Consume Measuring Device Installation

  • Land Use License

    • Architectural Drawings

    • Antecedent and Record Drawings

    • Cadastral Certificate

    • Official Number

    • Hydrological Study

    • Geological Study 

    • Soil Mechanics Study

    • Mobility Impact Study

    • Land Use Feasibility

  • Building Civil Protection License

    • Civil Protection Risk Analysis

    • Civil Protection Approval

    • Building and Construction Contingency Plan

Environmental Impact

  • Land Use ChangeTechnical Study

  • Federal and State Environmental Impact Assessment

  • Federal and State Environmental Risk Assessment

  • Accident Prevention Program

  • Social Impact Assessment

  • Environmental Impact Conditions Compliance Report

Imágenes.png

Compliance with the NAE-SDS-002-2019 for regulatory compliance

  • Operating License per Air Emissions Source

  • Civil Protection Contingency Plan for the Construction Industry

  • Emergency Brigade Training

  • Environmental Impact Mitigation Measures, Implementation and Monitoring Records

  • Hazardous Waste Register and Management Plan

  • Non Hazardous Waste Register and Management Plan

  • Annual, Federal and State Operation Card

Laboratory Testing

  • PM10 and PM2.5 Emissions Study

  • Environmental Noise Assessment Study 

NOM-031-STPS-2011- Construction Industry

  • Risk Analysis

  • Programmes

  • Procedures

  • Safety Measures

  • Training

  • Authorisations

  • Records