PRE-OPERATIVE LEGAL COMPLIANCE
Procedures, Permits and Construction Licenses
Environmental Site Assessment
-
Due Dilligence
- Phase I ESA
-
Phase II ESA
Land Use, Construction and Building Licenses
-
Water and Drainage Connection Procedurese
-
Water and Drainage Feasibility
-
Pluvial Project Approval
-
Secondary Networks Approval
-
Feasibility of Electrical Energy
-
-
CFE Contract
-
Installation Verification and Approval Report
-
Electricity Consume Measuring Device Installation
-
-
Land Use License
-
Architectural Drawings
-
Antecedent and Record Drawings
-
Cadastral Certificate
-
Official Number
-
Hydrological Study
-
Geological Study
-
Soil Mechanics Study
-
Mobility Impact Study
-
Land Use Feasibility
-
-
Building Civil Protection License
-
Civil Protection Risk Analysis
-
Civil Protection Approval
-
Building and Construction Contingency Plan
-
Environmental Impact
-
Land Use ChangeTechnical Study
-
Federal and State Environmental Impact Assessment
-
Federal and State Environmental Risk Assessment
-
Accident Prevention Program
-
Social Impact Assessment
-
Environmental Impact Conditions Compliance Report
Compliance with the NAE-SDS-002-2019 for regulatory compliance
-
Operating License per Air Emissions Source
-
Civil Protection Contingency Plan for the Construction Industry
-
Emergency Brigade Training
-
Environmental Impact Mitigation Measures, Implementation and Monitoring Records
-
Hazardous Waste Register and Management Plan
-
Non Hazardous Waste Register and Management Plan
-
Annual, Federal and State Operation Card
Laboratory Testing
-
PM10 and PM2.5 Emissions Study
-
Environmental Noise Assessment Study
NOM-031-STPS-2011- Construction Industry
-
Risk Analysis
-
Programmes
-
Procedures
-
Safety Measures
-
Training
-
Authorisations
-
Records